Equipment maintenance and spot check of FTTH drop cable production line (一)

December 30, 2021

Latest company news about Equipment maintenance and spot check of FTTH drop cable production line (一)

1. Electrical spot inspection and maintenance.

Item description Period Remark
800mm steel wire pay off 1.The electrical cabinet dedusts regularly. 3month Ensure that electrical components are clean
2.The electrical terminals are fastened. 6month Make sure the electrical wiring terminal bolts are fastened
3.Indicator light, knob switch whether display, knob is reliable. 15days Make sure the indicator light can be indicated and the knob is flexible
6heads active pay off Electric gas cabinet dust removal and wiring terminal fastening, indicator light knob and indicator light. 15days Same as above
Main control penal Electric gas cabinet dust removal and wiring terminal fastening, indicator light knob and indicator light. 15days Same as above
Main extruder 1.Electric gas cabinet dust removal and wiring terminal fastening, indicator light knob and indicator light. 15days Same as above
2.The heating ammeter shows normal or not, whether the heating plug is plugged in securely Every week Observe whether the actual current of the ammeter is indicated.
3.Check whether the thermocouple is connected reliably. 3month Whether there is a loose phenomenon.
4.Extruder motor and cooling fan. Every week Observe whether the cooling fan is rotating normally, whether there is an abnormal sound, and whether the motor temperature of the extruder is normal.
Traction device 1.Check traction motor and traction cooling fan. Every week Observe whether the cooling fan is rotating normally, whether there is an abnormal sound, and whether the motor temperature of the extruder is normal.
2.Select the switch is sensitive and reliable, loose or not. Every week Make sure the indicator light can be indicated and the knob is flexible.
Accumulator 1.The electrical cabinet dedusts regularly. 3month Ensure that electrical components are clean
2.The electrical terminals are fastened. 6month Make sure the electrical wiring terminal bolts are fastened
3.Check Tension voltmeter and potentiometer, knob, indicator light. Every week Observe the tension meter, the indicator light is normal or not, the potentiometer, the knob is reliable or not, the rotation is flexible or not.
Take up machine 1.The electrical cabinet dedusts regularly. 3month Ensure that electrical components are clean
2.The electrical terminals are fastened. 6month Make sure the electrical wiring terminal bolts are fastened
3.Check The potentiometer, knob and indicator are normal or not. Every week Observe whether the indicator light is normal, the potentiometer, the knob is reliable, the rotation is flexible, whether it is loose or not.

 

2.Mechanical spot check maintenance.

Item description Period Remark
800mm steel wire pay off 1.The worm gear reducer is lubricated regularly 12moth

Suggest use sinopec brand L-CKE/P 320

Remark:a little more than the center of the oil mark

2.The pneumatic sliding shaft is lubricated regularly Every week 1# General purpose lithium lubricating grease

3. Regularly check whether all screw bolt is loose, there is no noise and sound equipment, pneumatic components without leakage, a thread guide wheel rotation is flexible, has no bearing ring, vibration, stuck, erase the foreign bodies on a regular basis

 

Every week  
6heads active pay off 1.Decelerate motor reducer with regular grease. 36month It is not necessary to add grease during the service life of the speed reducer.
2.Regularly check whether all screw bolt is loose, there is no noise and sound equipment, pneumatic components without leakage, a thread guide wheel rotation is flexible, has no bearing ring, vibration, stuck, erase the foreign bodies on a regular basis。 Every week  
Main extruder 1.Decelerate motor reducer with regular grease. 6-12month Suggest use No.220# gear oil
2.Check the surface of the belt regularly to see whether there are scars, rupture, wear, multiple belt tensioning, and whether the belt grooves are polished. Every week Open the belt cover and observe the belt transmission with abnormal sound , noise and vibration.
3.Check the screw surface regularly for scratches, cracks and key links. Every week  
4.Regularly check whether all the bolts are loose, the equipment is noiseless and abnormal, the bearing has abnormal, vibration, knocked, regularly erasing the foreign body. Every week  
Traction device 1.The worm gear reducer is lubricated regularly 12month

Suggest use sinopec brand L-CKE/P 320

Remark:a little more than the center of the oil mark

2.The traction wheel with pulsation or not, the surface of the wheel has cracks, wear, grooves or not; if have wear and tear on the flat belt. Every week  
3.Regularly check whether all the bolts are loose, the equipment is noiseless and abnormal, the bearing has abnormal, vibration, knocked, regularly erasing the foreign body.。 Every week  
Accumulator 1.The line slide rail must be lubricated regularly. Every week 1#General purpose lithium lubricating grease
2.The chain pulley of the cable rack, the chain regularly check the chain tensioning, the butter, check the chain, the sprocket grinding condition;Check whether the gear of the potentiometer is loose, the tooth surface is not worn, and the gear is regularly buttered. Every week The magnetic powder clutch should be filled with magnetic powder every year.
3.Regularly check whether all the bolts are loose, the equipment is noiseless and abnormal, the bearing has abnormal, vibration, knocked, regularly erasing the foreign body. Every week  
Take up machine 1.Linear guide and ball screw must be lubricated regularly. 15days 1#General purpose lithium lubricating grease
2.Transmission synchronous with no abrasion, crack, oil, and without skip tooth phenomenon, synchronous belt wheel wear;The bearing need put butter regularly . 15days  
3.Regularly check whether all the bolts are loose, the equipment is noiseless and abnormal, the bearing has abnormal, vibration, knocked, regularly erasing the foreign body. Every week